top of page

The Hat 5 Corners  

Located in Edmonton AB, we were part of the concrete division, our work there was finish the concrete as the building was growing, fix any concrete deficiency, such as grinding, patching, bushammering.

  • Sack&Rub the staircase, from level 1 to level 16, make them ready for paint.
     

  • Sack&Rub balconies, from level 3 to level 16, make them ready for paint.
     

  • Grind edges top of the balconies make sure they are in good condition for membrane.|
     

  • Ceiling Grinding all the floors.
     

  • Placing Concrete parking lot