top of page

The University of Alberta

Located in Edmonton AB, we were part of the concrete division, our work there was to achieve a smooth finish on the stairwells as a finished product

  • Sack&Rub stairs from level 1 to 8 in all 5 staircases.

  • Bush hammer any concrete surface on the walls if it was required. 

  • Protect other finish product trades, such as drywall or door frames 

  • Patch and skim coat before apply Sack&Rub products.

bottom of page